Project Summary
At Maumee Assembly & Stamping, we de-commissioned a 40-year-old steam boiler system and replaced it with (10) high efficiency Cambridge heating and ventilating systems. These systems have a reputation of energy savings (see case study below). This project was a "Better Buildings" energy upgrade program that compelled the investment in saving energy and reducing the burning of fossil fuels.
Market Sector
- Industrial
- Manufacturing
Services
- Design/Build
- 3D CAD & BIM Modeling
- Sheet Metal Fabrication
- KoolDuct Fabrication
- Installation
- Service
- Preventative Maintenance
Details
- Servicing:
- 2015-2024